Shipping & Freight Policy
Last Updated: November 2026 • Effective for all domestic and international cargo handling, freight forwarding, vehicle shipping, and door-to-door consignments managed by Pro-Technique Service.
1. Scope of Logistics Operations
Pro-Technique Service operates as a licensed freight forwarder, cargo coordinator, and multimodal transport provider. These policies govern all consignments tendered to Pro-Technique Service for transport via air freight, ocean vessel (Full Container Load [FCL] and Less than Container Load [LCL]), over-the-road trucking, and specialized vehicle haulage.
2. Transit Times & Delivery Estimates
All delivery timelines communicated in quotations or booking confirmations are good-faith estimates based on standard commercial carrier schedules and typical port clearance intervals:
- Express Air Freight: Typically 2 to 5 business days from airport departure to destination arrival, excluding customs holds.
- Ocean Freight (FCL / LCL): Typically 14 to 35 business days depending on origin port, maritime congestion, and transshipment hubs.
- Inland & Door-to-Door Delivery: Final-mile dispatch occurs within 24 to 72 hours following official customs clearance and duty settlement at the port of entry.
Transit schedules may be influenced by maritime conditions, weather disruptions, port strikes, carrier blank sailings, or mandatory customs physical inspections. Pro-Technique Service provides continuous status updates during unforeseen delays.
3. Packaging, Crating & Inspection Standards
Shippers are responsible for ensuring that all tendered cargo is properly packaged, labeled, and secured to withstand the normal rigors of international transport:
- Palletized Goods: Cargo must be firmly shrink-wrapped and strapped to ISPM-15 certified heat-treated wooden pallets or plastic pallets.
- Fragile & Sensitive Cargo: Must be crated with adequate internal cushioning, shock dampening, and moisture barriers.
- Right of Inspection: For security compliance and customs verification, Pro-Technique Service and carrier representatives reserve the right to inspect packages to confirm contents, weight, and dimensions match tender documents.
4. Customs Clearance, Duties & Taxes
Unless expressly specified in a written DDP (Delivered Duty Paid) quotation:
- The consignee (receiver) or shipper is legally responsible for all destination import duties, excise taxes, VAT, port tariffs, quarantine inspection fees, and customs brokerage charges.
- Shippers must provide accurate commercial invoices, packing lists, and certificates of origin prior to cargo departure.
- Pro-Technique Service is not liable for cargo seizures, delays, or penalties resulting from inaccurate cargo descriptions, undervaluation, or missing documentation provided by the shipper.
5. Vehicle & Rolling Cargo Protocols
For automobiles, trucks, machinery, and rolling stock shipped via Roll-on/Roll-off (RoRo) or containerized transport:
- Fuel Level: Fuel tanks must contain no more than one-quarter (1/4) tank of fuel in compliance with maritime fire safety regulations.
- Personal Effects: Vehicles transported via RoRo must be completely empty of personal items, tools, and loose baggage, unless booked under a specialized containerized vehicle agreement.
- Keys & Mechanical Condition: Vehicles must be in operating condition with working brakes, steering, and ignition keys, unless booked explicitly as non-running cargo requiring winch loading.
- Documentation: Original title, lien release (if applicable), and bill of sale must be verified prior to export clearance.
6. Prohibited & Restricted Goods
The following items will not be accepted for carriage without prior written authorization, specialized hazardous declarations, and licensed permits:
- Explosives, fireworks, ammunition, and military hardware.
- Flammable liquids, toxic gases, radioactive materials, and corrosives (IMO Dangerous Goods Class 1–9).
- Illicit narcotics, contraband, and counterfeit merchandise.
- Live animals, endangered species, or unprocessed ivory.
- Currency, bullion, precious gems, and uncancelled bearer instruments.
7. Demurrage, Storage & Warehousing
Ports, marine terminals, and air carrier warehouses offer limited free storage time upon cargo arrival (typically 3 to 7 calendar days depending on the facility):
- Consignees must take delivery or complete customs entry before the expiration of free time.
- Any demurrage, detention, chassis rental, or storage charges accrued due to delayed customs documents, unpaid tariffs, or consignee unresponsiveness are billed directly to the customer account.
8. Cargo Tracking & Milestones
Every shipment is issued an internal reference number, Air Waybill (AWB), or Bill of Lading (BOL). Customers can verify shipment progress through direct dispatcher notifications via email and WhatsApp, including departure confirmations, port arrivals, customs release notices, and final delivery receipts.
9. Damage Inspection & Claims Protocol
Upon taking delivery of cargo:
- The consignee must perform an immediate external inspection before signing the Delivery Receipt (Proof of Delivery / POD).
- Any visible loss or damage must be specifically noted on the delivery receipt in the driver's presence.
- Written notice of concealed damage must be filed with Pro-Technique Service within seven (7) calendar days of delivery, accompanied by photographs, original packaging, and commercial invoices.